Ongoing Projects
|
Project Description |
|
Role (e.g. main Contractor, sub Contract or Consultancy etc) |
Project manager, or Project engineer or supervisor |
Client |
Period |
Contact Address of Client or main contractor |
|
9 Nos Turnkey Site Build and Equipment Supply (Tower, Transformer, Palisade Fence, Generator, AVR and Rectifiers) of 55m Andrew Tower ( Turnkey Site Build and Equipment Supply (Tower, Transformer, Palisade Fence, Generator, AVR and Rectifiers) of 55m Andrew Tower @ Taraba State, Kaduna State, Nassarawa State and Kogi State, Nigeria |
|
Main Contractor |
Raheem Adebayo |
MTN |
2010 |
MTN Communication Nig. Ltd.
3rd Floor, Golden Plaza,
Falomo round-about,
Ikoyi - Lagos, Nigeria |
|
14 Nos Turnkey Site Build and Equipment Supply (Tower, Transformer, Palisade Fence, Generator, AVR and Rectifiers) of 55m Andrew Tower @ Gule, Kampala, Arua, Muyoko, Wakiso and Masaka, Uganda. |
|
Main Contractor |
Ernest Mike |
MTN |
2010 |
MTN Uganda Limited
MTN Towers
22, Hannington Road.
P.O.Box 24624,
Kampala, Uganda |
|
Turnkey Site Build of 55m ADC Tower @ Jigawa (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter & Generator Plinths, Fencing + Gate, Gate House, Apron, SHelter Assembling + Installation on site, RF, Generator & Transformer Installation, BTS Installation & Shelter Electrical Reticulation). |
|
Sub Contractor |
David Cullin |
MTN |
2010 |
Alan Dick & Co (ADC), Adeyemo Alakija Street, Victoria Island, Lagos |
|
10 Nos Turnkey Site Build and Equipment Supply (Tower, Transformer, Palisade Fence, Generator, AVR and Rectifiers) of 54m Andrew Tower @ Busia, Iganga, Mbale, Tororo, Guru, Kamulu & Luwero, Uganda. |
|
Main Contractors |
Ernest Mike |
Vmobile |
2009 |
MTN Uganda Limited, MTN Towers, 22, Hannington Road, P.O.Box 24624, Kampala, Uganda. |
|
3 Nos Turnkey Site Build of 54m Andrew Tower @ Amoro, Apae & Kitgum, Uganda. (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter & Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator & Transformer Installation, BTS Installation & Shelter Electrical Reticulation). |
|
Main Contractor |
Pius Isungoma |
UTL |
2009 |
Uganda Telecom Limited (UTL), Kampala, Uganda |
|
7 Nos Turnkey Site Build and Equipment Supply (Tower, Transformer, Palisade Fence, Generator, AVR and Rectifiers) of 60m Andrew Tower @ different locations in Jos, Plateau State. |
|
Main Contractor |
Mr. Churchill |
Multi-links Telkom |
2009 |
Multi-links / Telkom Nig. Ltd., Adeola Odeku Street, Victoria Island, Lagos. |
|
2 Nos Turnkey Site Build of 35m & 50m Tower @ Ogun State (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Hussain |
GLO |
2009 |
Globacom Nigeria Ltd., Agoro Odiyan Street, Victoria Island, Lagos. |
|
Supply and Installation of 103m Webb Tower and FM / UHF TV Antenna Installation @ Mount Patti |
|
Main Contractor |
Mr. Habeeb |
Smooth FM |
2009 |
Fenchurch Group Limited, Saka Tinubu Street, Victoria Island, Lagos. |
|
Supply and Installation of 103m Webb Tower and FM / UHF TV Antenna Installation at Mount Patti. |
|
Main Contractor |
Mr. Isa |
Kiss FM |
2008 |
Kiss Communication Limited, Ologun Agbaja Street, Off Ajose Adeogun Street, Victoria Island, Lagos. |
|
30 Nos Turnkey Site Builds in various locations in Uganda (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Joseph David |
Warid Telecom |
2008 |
Ericsson - Uganda, Kampala, Uganda |
|
10nos Turnkey Site Builds in various locations in Western Uganda (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Mr. Shawn |
Warid Telecom |
2008 |
Main Contractor, Huawei - Uganda, 3rd & 4th Floor, Twed Plaza, Lumumba Avenue, Kampala, Uganda |
|
9 Nos Turnkey Site Build of 35m Tower @ Kano, Lagos & Nassarawa State (Includes Tower Foundation, Earthing, Erection, Painting, Shelter Assembling + Installation on site, RF, Generator and Transformer, BTS Installation, Shelter Electrical Reticulation) |
|
Main Contractor |
Hussein |
GLO |
2008 |
Globacom Nigeria Limited, Agoro Odiyan Street, Victoria Island, Lagos. |
|
7 Nos Turnkey Site Build of 50m Tower @ Zamfara, Kogi & Katsina State (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter Assembling + Installation on site, RF, Generator and Transformer, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Hussein |
GLO |
2008 |
Globacom Nigeria Limited, Agoro Odiyan Street, Victoria Island, Lagos. |
|
2 Nos Turnkey Site Build of 70m Tower @ Zamfara & Kogi State (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter Assembling + Installation on site, RF, Generator and Transformer, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Hussein |
GLO |
2008 |
Globacom Nigeria Limited, Agoro Odiyan Street, Victoria Island, Lagos. |
|
5 Nos Turnkey Site Build of 60m Tower @ Bauchi & Plateau State (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter Assembling + Installation on site, RF, Generator and Transformer, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Natalie |
Celtel |
2008 |
Huawei Nigeria Company, Floor 8th, 9th & 10th, Plot 98, Adeola Odeku Street, South Atlantic Petroleum Towers, Victoria Island, Lagos. |
|
2 Nos Installation of 36 S2 Liftmaster Tower @ GRA & Behind Millionaires Quarter, Nassarawa State. |
|
Main Contractor |
Andre Mitcham |
MTN |
2008 |
Plessey Nigeria Limited, 9th Floor, Eleganza Biro House, Adeyemo Alkija, Victoria Island, Lagos. |
|
7 Nos Turnkey Site Build of 35m ADC Tower @ various locations in Kano State (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter Assembling + Installation on site, RF, Generator and Transformer, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Natalie |
MTN |
2008 |
Huawei Nigeria Company, Floor 8th, 9th & 10th, Plot 98, Adeola Odeku Street, South Atlantic Petroleum Towers, Victoria Island, Lagos. |
|
Supply and Installation of 111m Webb Tower and FM/UHF TV Antenna Installation at Mount Patti, Lokoja |
|
Main Contractor |
Simbabi Ogbeha |
CCN |
2007 |
Confluence Cable Network, Mount Patti, Lokoja |
|
8 Nos Turnkey Site Build of 35m Tower @ various locations in Kano State & Abuja )Include: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Natalie |
MTN |
2007 |
Huawei Nigeria Company, Floor 8th, 9th & 10th, Plot 98, Adeola Odeku Street, South Atlantic Petroleum Towers, Victoria Island, Lagos. |
|
3 Nos Turnkey Site Build of 70m ADC Tower @ Isua-Ile, Ajibola Aremo & Iberin Isara (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Mr. Gary Frost |
MTN |
2007 |
Main Contractor, Ericsson Nigeria, Walter Carrinton Close, Victoria Island, Lagos |
|
2 Nos Turnkey Site Build of 55m ADC Tower @ Emure-Ile & Ago Paanu (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Mr. Gary Frost |
MTN |
2007 |
Main Contractor, Ericsson Nigeria, Walter Carrinton Close, Victoria Island, lagos.. |
|
Turnkey Site Build of 35m ADC Tower @ Tanhigh Flat (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Mr. Gary Frost |
MTN |
2007 |
Main Contractor, Ericsson Nigeria, Walter Carrinton Close, Victoria Island, Lagos. |
|
Turnkey Site Build of 36m ADC Tower @ Abuja (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Natalie |
MTN |
2007 |
Huawei Nigeria Company, Floor 8th, 9th & 10th, Plot 98, Adeola odeku Street, Victoria Island, Lagos. |
|
6 Nos Turnkey Site Build of 55m ADC Tower @ various locations in Kano State (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Natalie |
MTN |
2007 |
Huawei Nigeria Company, Floor 8th, 9th, & 10th, Plot 98, Adeola Odeku Street, Victoria Island, Lagos. |
|
Turnkey Site Build of 35m Andrew Tower @ Ogundiran Street, Lagos (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Adewale Otitoju |
MTN |
2007 |
Reime West Africa Limited, 177A, Sinari Daranijo Street, Off Ligali Ayorinde Street, Victoria Island, Lagos. |
|
2 Nos Turnkey Site Build of 75m Andrew Tower @ Angun Loko & Garawa (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Adewale Otitoju |
MTN |
2007 |
Reime West Africa Limited, 177A, Sinari Daranijo Street, Off Ligali Ayorinde Street, Victoria Island, Lagos. |
|
2nos Turnkey Site Build of 35m ADC Tower @ Agbor & Ogwashi Uku (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Victor Wobo |
MTN |
2007 |
Alan Dick & Co. (ADC), Adeyemo Alakija Street, Victoria Island, Lagos |
|
4 Nos Turnkey Site Build and Equipment Supply (Tower, Transfer, Palisade Fence, Generator, Shelter, Diesel Tank, AVR & Rectifiers) of 60m Andrew Tower @ Kirbutu, Mayo Hako, Gashida & Yusufari (Includes: Tower fiundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Amanuel Araya |
Celtel |
2007 |
Mass Telecom Innovation Limited (MTI), 18A, Gerrard Road, Ikoyi, Lagos. |
|
Turnkey Site Build and Equipment Supply (Tower, Transfer, Palisade Fence, Generator, Shelter, Diesel Tank, AVR & Rectifiers) of 70m Andrew Tower @ Sabon-Gida (Include: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Amanuel Araya |
Celtel |
2007 |
Mass Telecom Innovation Limited (MTI), 18A, Gerrard Road, Ikoyi, Lagos. |
|
2 Nos Turnkey Site Build and Equipment Supply (Tower, Transfer, Palisade Fence, Generator, Shelter, Diesel Tank, AVR & Rectifiers) of 80m Andrew Tower @ Mararaba & Ganye Road (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Amanuel Araya |
Celtel |
2007 |
Mass Telecom Innovation Limited (MTI), 18A, Gerrard Road, Ikoyi, Lagos. |
|
2 Nos Turnkey Site Build and Equipment Supply (Tower, Transfer, Palisade Fence, Generator, Shelter, Diesel Tank, AVR & Rectifiers) of 60m Tower @ Ijebu & Akunu, Ondo State (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Leon |
Celtel |
2007 |
Tilca Nigeria Limited, 58, Okoya Thomas Crescent, Victoria Island, Lagos. |
|
5 Nos Turnkey Site Build of 55m ADC Tower @ Mbutu, Oru, Obolloafor, Umukwata & Building Material Market, Onitsha (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Tranformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Victor Wobo |
MTN |
2007 |
Alan Dick & Co (ADC), Adeyemo Alakija Street, Victoria Island, Lagos. |
|
2 Nos Turnkey Site Build of 35m Tower @ Lekki-Ajah, Lagos & Minna (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Hussein |
GLO |
2007 |
Globacom Nigeria Limited, Agoro Odiyan Street, Victoria Island, Lagos. |
|
6 Nos Turnkey Site Build of 50m Tower @ Gerin Itashe, Burni Yadi, Damboa Road, Benieshieke, Gujba Mosque & Ogun State (Includes: Tower Foundation, Earthing Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Hussein |
GLO |
2007 |
Globacom Nigeria Limited, Agoro Odiyan Street, Victoria Island, Lagos. |
|
2 Nos Turnkey Site Build of 70m Tower @ Minna & College Agriculture (Includes: Tower Foundation, Earthing, erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Hussein |
GLO |
2007 |
Globacom Nigeria Limited, Agoro Odiyan Street, Victoria Island, Lagos. |
|
Turnkey Site Build of 60m Tower @ Lokoja (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Leon |
Celtel |
2007 |
Tilca Nigeria Limited, 58, Okoya Thomas Crescent, Victoria Island, Lagos. |
|
Turnkey Site Build and Equipment Supply (Tower, Transfer, Palisade Fence, Generator, Shelter, Diesel Tank, AVR and Rectifiers) of 45m Tower @ Bori, Port Harcourt (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
Leon |
Celtel |
2007 |
Tilca Nigeria Limited, 58, Okoya Thomas Crescent, Victoria Island, Lagos. |
|
Turnkey Site Build of 55m ADC Tower @ Uga, Anambra (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, Shelter Electrical Reticulation). |
|
Main Contractor |
David Cullin |
MTN |
2007 |
Alan Dick and Co. (ADC), Adeyemo Alakija Street, Victoria Island, Lagos. |
|
6 Nos Installation of 54m S2 Liftmaster Tower @ various locations in Imo State. |
|
Main Contractor |
Andre Mitcham |
MTN |
2006 |
Plessey Nigeria Limited, 9th Floor, Eleganza Biro House, Adeyemo Alakija Street, Victoria Island, Lagos. |
|
Installation of Rooftop Tower, Electrical, Shelter and Generator Plinths @ Golden plaza, Falomo, Ikoyi, Lagos. |
|
Sub-Contractor |
David Cullin |
MTN |
2006 |
Alan Dick & Co. (ADC), Adeyemo Alakija Street, Victoria Island, Lagos. |
|
Turnkey Site Build of 55m ADC Tower @ Jigawa State (Includes: Tower Foundation, Earthing, Erection, Painting, Shelter and Generator Plinths, Fencing + Gate, Gate House, Apron, Shelter Assembling + Installation on site, RF, Generator and Transformer Installation, BTS Installation, SHelter Electrical Reticulation). |
|
Sub-Contractor |
David Cullin |
MTN |
2006 |
Alan Dick & Co (ADC), Adeyemo Alakija Street, Victoria Island, Lagos. |
|
Installation of Tower Foundation, Fence, Retaining wall, Shelter / Generator / Nepa Plinths & Erection / Painting of 45m Tower @ Sura, Lagos. |
|
Sub-Contractor |
Engr. Sadiq |
VMobile |
2006 |
|
|
 |
|
|
|
 |